Earned value analysis is used to calculate the project status on two fronts: Schedule. Is the project ahead of or behind schedule? Cost. Is the project over or under budget? Let's say you are the project manager for the renovation of 3 hotel rooms. The tasks are as follows: Preparation. Jan. 1 - Jan. 10, $5,000. Room #1: Jan. 10 - 20, $15,000. Room … [Read more...]
The Practical Guide to Earned Value Analysis
It's amazing how many projects do not know their true status until near the end, when there is little that can be done to ensure they finish on time or budget. The proper time to rigorously track project status is at the beginning, not at the end. This is when project risk can be managed and changes made to get it back on track. Earned value analysis is the current … [Read more...]
Effective Project Control
Putting out fires is rarely a good project management strategy. Project controls are where the project manager earns their wages. Assigning work to someone is relatively easy, but how do you ensure the quality of the work is acceptable, or that the deadlines will be met? Fortunately, project management theory contains techniques which are used to track and … [Read more...]
Implementing Six Sigma
Six Sigma is a program to increase product quality in a production process. It is ideally suited to manufacturing processes which produce high volumes of products, but the concepts are relevant to any industry. Even in our engineering consulting firm, Six Sigma concepts are quite valuable to assessing and improving the quality of reports and data that is submitted to … [Read more...]
How to Get Six Sigma Certified
Six Sigma is a technique used to reduce defects in the manufacturing process. Although it was originally developed for the manufacturing industry, it can be used to improve any business process by using data and statistical analysis to reduce mistakes, rework, and waste. I've found that my six sigma certification (black belt) has helped me to reduce quality issues at the … [Read more...]
Introduction to Six Sigma
Six Sigma is a hot buzzword these days, but what is it and how does it really work? In this article I will give you a quick overview and get you grounded to see if it will help you. In reality it takes a week long intensive course to get all the concepts, and requires several months of hands on experience if you want to become a green or black belt. Therefore, this is … [Read more...]
Perform a Value Study on your Project
A Value Study attempts to improve the value of a project using value engineering methodology. This is defined by the Value Methodology Standard, published by SAVE International. Typically, a value engineering team meets for 1-3 weeks, during which they work through the "job plan" as outlined by the standard. According to the Value Methodology standard, there are 6 … [Read more...]
How you can use Value Engineering
In my industry, value engineering is something that's codified in the standard specification book, the one that's tossed into every contract to define the standards for the project. It allows a Contractor to approach the owner/consultant and request design changes. If approved, the savings are shared with the Contractor. I've never seen the clause used, although I can … [Read more...]
Superior Work Breakdown Structures
In project management, a Work Breakdown Structure (WBS) is a planning tool whereby the project scope is divided into logical sub-components. It is a graphical representation of the project scope and forms the basis for further planning, such as the cost and schedule. It is not a scheduling or costing tool. A good WBS should be created in advance of the schedule to keep the … [Read more...]
Create a Scope Management Plan
Scope issues are the #1 reason for project failure. Today more than ever, it's imperative that all projects need a scope management plan. In its absence, project stakeholders tend to assume the project boundaries in their favor, and the result is generally not good. If there's one thing a project manager can do to make project run smoother, it's to establish the scope … [Read more...]