A Value Analysis attempts to improve the value of a project using value engineering methodology. This is defined by the Value Methodology Standard, published by SAVE International. It is defined as an assessment of a product that attempts to minimize its cost in relation to its functions. Typically, a value engineering team meets for 1-3 weeks, during which they … [Read more...]
What is Value Engineering?
In most industries, standard methods of problem solving have been developed. For example, if you want to build a road from point A to point B and there's a stream in between, you build a standard type of bridge. Human nature tends toward the familiar. If that type of bridge was built many times before, all parties will tend towards duplicating the previous … [Read more...]
Perform a Value Study on your Project
A Value Study attempts to improve the value of a project using value engineering methodology. This is defined by the Value Methodology Standard, published by SAVE International. Typically, a value engineering team meets for 1-3 weeks, during which they work through the "job plan" as outlined by the standard. According to the Value Methodology standard, there are 6 … [Read more...]
How you can use Value Engineering
In my industry, value engineering is something that's codified in the standard specification book, the one that's tossed into every contract to define the standards for the project. It allows a Contractor to approach the owner/consultant and request design changes. If approved, the savings are shared with the Contractor. I've never seen the clause used, although I can … [Read more...]
How to Perform a Value Study
A Value Study attempts to improve the value of a project using value engineering methodology. This is defined by the Value Methodology Standard, published by SAVE International. Typically, a value engineering team meets for 1-3 weeks, during which they work through the "job plan" as outlined by the standard. According to the Value Methodology standard, there are 6 … [Read more...]
Incorporate Value Engineering into your Projects
In my industry, value engineering is something that's codified in the standard specification book, the one that's tossed into every contract to define the standards for the project. It allows a Contractor to approach the owner/consultant and request design changes. If approved, the savings are shared with the Contractor. I've never seen the clause used, although I can … [Read more...]